Third-party inspection services in Turkey

Independent inspectors at your supplier's facility, verifying conformity at the stages that matter and reporting facts you can act on.

Overview

Your eyes at the supplier, with engineering judgement

Third-party inspection, also called vendor, source or shop inspection, places an independent inspector at the manufacturer's premises to verify that purchased goods meet the purchase order, drawings, specifications and applicable codes before they leave the factory.

QUALITAS TR covers the full range of manufacturing inspection, from raw material and in-process checks through final and pre-shipment inspection to container loading. Inspections can be single visits, a programme of visits linked to an ITP, or continuous surveillance for critical orders.

Our inspectors have engineering backgrounds in metallurgy, mechanical manufacturing and quality engineering. They read drawings and specifications, understand how the part is made and recognise early signs of a problem, which is what separates useful inspection from box ticking.

Services in this family

Each service page explains scope, methodology, standards and deliverables.

02.02

Dimensional and Geometrical Inspection

Dimensional, GD&T and drawing compliance verification, CMM witnessing, laser measurement coordination and first article layouts.

Service details
02.03

Mechanical Equipment Inspection

Inspection of rotating and static mechanical equipment: assembly, hardness, mechanical, load, pressure, leak and running tests.

Service details
02.05

Pre-Shipment Inspection

Final random or complete inspection of finished goods before shipment: quantity, conformity, workmanship, packing and marking.

Service details

Complete scope of activities

Inspection activities grouped by discipline. Scope is always set by your purchase order, ITP or inspection instruction.

  • Raw material inspection
  • Manufacturing process inspection
  • In-process inspection
  • Final inspection
  • Pre-shipment inspection
  • Shop and workshop inspection
  • Site inspection
  • Production surveillance
  • Dimensional verification
  • Geometrical tolerance inspection
  • GD&T verification
  • CMM inspection witnessing
  • Laser measurement coordination
  • Reverse engineering measurement support
  • First article dimensional inspection
  • Drawing compliance verification
  • Visual and dimensional inspection
  • Hardness testing
  • Mechanical test witnessing
  • Load testing witnessing
  • Pressure and leak testing witnessing
  • Functional and performance testing
  • Electrical panel inspection
  • Electrical equipment inspection
  • Instrumentation inspection
  • Cable and wiring inspection
  • Electrical test witnessing
  • Packaging and preservation inspection
  • Export packaging inspection
  • Marking and labelling verification
  • Container condition inspection
  • Loading supervision
  • Shipment readiness verification

Inspection points defined before production starts

Hold, witness and review points give the buyer control without stopping the supplier's work unnecessarily.

Inspection and Test Plan: hold, witness and review points

A typical ITP sequence for a fabricated and machined assembly.

Example sequence
#ActivityReferenceSupplierThird partyRecord
1Pre-inspection meeting, ITP and drawing revision checkPO, specificationPHMinutes
2Material certificate review and identificationEN 10204 3.1PRMTC log
3WPS, PQR and welder qualification reviewISO 15614, ISO 9606PRReview sheet
4Fit-up and in-process weld visual inspectionISO 17637, ISO 5817PWWeld map
5NDT after final heat treatmentProject NDT procedurePWNDT reports
6Final dimensional inspectionDrawing, GD&TPHDimensional report
7Pressure or functional testTest procedurePHTest certificate
8Coating DFT, marking, packing and releaseCoating spec, packing specPHRelease note
P perform · H hold point: work stops until the inspector attends or waives · W witness point: inspector notified, work may proceed if not attending · R document review.

How we work

From inspection request to release note

Every visit follows the same disciplined sequence, so reports are comparable across suppliers and orders.

  1. Inspection instruction

    We confirm scope, documents, acceptance criteria, sampling and the latest drawing revisions before travelling.

  2. Supplier coordination

    Date, readiness and access are confirmed with the supplier. Partial readiness is reported, not hidden.

  3. Inspection

    Documents, material, dimensions, workmanship, testing and marking are checked against the agreed criteria with photographs and measured values.

  4. Findings

    Deviations are discussed with the supplier on site and classified as critical, major or minor.

  5. Report

    A structured report with a clear verdict: accepted, accepted with remarks, or rejected, issued within the agreed time.

Frequently asked questions

Is QUALITAS TR an accredited inspection body?

No. QUALITAS TR provides independent second- and third-party inspection on behalf of buyers. Where a regulation or contract requires an inspection body accredited to ISO/IEC 17020 or a notified body, we tell you and coordinate with such an organisation.

How quickly can an inspector attend?

For locations in central Anatolia a visit can often be arranged within one to three working days. Other regions depend on travel. Tell us the date and city and we confirm availability by return.

Direct contact. No forms.

Discuss your inspection, audit or project requirements

Send us the purchase order scope, drawings, specifications or ITP and the supplier location. You will receive a written proposal with scope, inspector profile, schedule and reporting format.